The berth after the major repairs, 2008 |
Lower Quay and start Pavilion, 2007 | Start Pavilion, 2007 | Start Pavilion, 2007 |
Before the reconstruction, 2001 | Before the reconstruction, 2001 | After the reconstruction, 2005 | Lower quay, 2006 |
Lower quay, 2014 |
Before the reconstruction, 2000 | Beginning of the reconstruction, 2003 | Beginning of the reconstruction, 2003 | Reconstruction of the Staircase, 2005 |
Dike dam with promenade | From height, 2007 | In bathing suit season | The main staircase |
Overall view |
Embankment and bank protection, 2013 |
|
|
Reconstruction, 2005 | Reconstruction, 2005 | Pier and beach area, 2014 | Beach area, 2014 |
Emergency to recovery | Emergency to recovery | Emergency to recovery | The recovery period |
After the reconstruction | After the reconstruction | After the reconstruction | After the reconstruction |
Emergency to recovery | Emergency to recovery | Emergency to recovery | Emergency to recovery |
After the reconstruction | After the reconstruction | After the reconstruction |
Before clearing the channel | Before clearing the channel | After clearing the channel | After clearing the channel |
Reconstruction | Period of operation, 2014 |
Before the reconstruction, 2007 | Before the reconstruction, 2007 | Reconstruction of the Western Buna, 2011 | Reconstruction of the Western Buna, 2011 |
Reconstruction of the Eastern Buna, 2011 | After the reconstruction of the Buna, 2012 | Western Boone-the pier for small boats, 2012 |
After the reconstruction of the beach, 2012 |
The first bathing season, 2012 | Operation beach, 2014 | Operation beach, 2014 |
General view | Reconstruction, 2007 | Reconstruction, 2007 | After the reconstruction, 2008 |
Beach area, 2008 | Beach area, 2008 |
General view, the concept of 1 | General view at night time, the concept of 1 | General view, the concept of 2 |
Before the reconstruction, 2009 | Before the reconstruction, 2009 | Reconstruction, 2010 | Reconstruction, 2010 |
After the reconstruction, 2011 | After the reconstruction, 2011 | After the reconstruction, 2011 | After the reconstruction, 2011 |
Reconstruction, 2013 | Reconstruction, 2013 | Reconstruction, 2013 |
Before the reconstruction, 2007 | Reconstruction, 2008 | Reconstruction, 2008 | After the reconstruction, 2014 |
After the reconstruction, 2014 | After the reconstruction, 2014 |
A stone with a commemorative badge | Сommemorative sign | Before reconstruction, 2006 | The reconstruction of the road. Laying geotextile panels, 2006 |
The reconstruction of the road. Laying of geogrid, 2006 |
The reconstruction of the road. Fill the cells of the geogrid, 2007 |
After the reconstruction, 2007 | After the reconstruction, 2007 |
After the reconstruction, 2007 | The period of operation of the road, 2008 |
1. Development of working drawings of department store’s building |
1. Dewatering at construction site "Southern Oil Refinery" (Tanitovskiy, 2008) |
1. Scheme of flood and shore activities on the river Kirpili (Reznichenko, 2008) |
1. Design and reconstruction of main water intake structures on the river Urup (Reznichenko, 2009) |
1. Headroom release of treated wastewater from the territory LLC "Afipskyoil refinery" to the river Ubin (Fedorova, Kutz, 2010) |
2. Bank protection measures to protect a land of plot from negative effects of the waters of the Adygako River with cadastral number .... in a village Thamaha in Seversky district of Krasnodar region ( Natsvin, 2015) |
1. Сoast reclamation of the left bank or the river Kovash and engineering preparation of the site for a residential estate “Zarechye” (Kutz, 2011) |
1. Defining the scope of work to complete the dredging for pipeline MG "Pochinki-Gryazovetz" (Natsvin, 2012) |